Project Management.

 

Project Management

 

We are able to plan, organise and control resources, procedures and protocols to successfully implement small scale projects through the use of trained, qualified and experienced staff.

 

Quality Assurance

 

We conduct regular, random site and desktop audits of all of our activities to ensure the operators compliance with the:

 

  • NSW Rail Safety Act 2012 (including Drug and Alcohol testing) o NSW Work Health and Safety Act 2011
  • NSW Protection of the Environment Operations Act 1997
  • Requirements of the Office of the National Rail Safety Regulator
  • Rail Infrastructure Managers Network Rules, Network Procedures and Corporate Policies and Procedures 

 


    Integrated Risk Management

    We have a systematic approach to managing Safety, Quality and Environmental risk. 


    Robust Policies and Procedures are supplemented by guidance documents for the identification, assessment and management of identified risks. 


    Rigorous assurances practices ensure that actions and processes are analysed and managed at the following levels:


    • Corporate
    • Operational
    • Team
    • Individual

    Projects


    Ulan tunnel number 1 project including:

    Site supervision

    Provided all safeworking requirements

    Labour

    Welding

    Welding adjustment

    Maintain and establish correct rail adjustment

    Earthworks

    Track Certification

    Maitland, Sandgate, Hexham re railing:

    Site supervision

    Provided all safeworking requirements

    Labour

    Welding

    Welding adjustment

    Track Certification

    Drayton’s Junction Loop:

    Supervision

    Provided all safeworking requirements

    Labour

    Install turnouts

    Build and lay track

    Welding

    Welding adjustment 

    Maintain and establish correct rail adjustment

    Track Certification

    Commissioning

    Bradken Yard:

    Inspections and major overhaul

    Supervision

    Provided all safeworking requirements

    Labour

    Refurbished turnout

    Installed new turnouts

    Slewed track

    Repaired road level crossing

    Detailed inspection

    Track Certification

    Supervision of drainage works and re railing on the ARTC south:

    Supervision

    Provided all safeworking requirements 

    Labour

    Culverts

    Under forming

    Minor re-sleepering

    Track Certification

    Re-sleepering and adjusting at Sandgate:

    Supervision

    Provided all safeworking requirements

    Labour

    Recondition and re-sleepering

    Maintain and establish correct rail adjustment

    Track Certification

    Sydney light rail inspections and quality control:

    Supervision

    Labour

    Detailed inspection of light rail

    Turnout inspections

    Grinding on new rail

    Hire of plant excavator and tipper truck 

    Track Certification

    Track reconditioning at Werris Creek, Maitland, Singleton:

    Supervision

    Safeworking

    Labour

    Maintain and establish correct rail adjustment

    Track Certification

    Level crossing repairs at Telarah:

    Supervision

    Labour

    Remove and replaced level crossing

    Replace road surface

    Track Certification

    ARTC possessions:

    Possession Protection Officers       

    Protection Officers

    Handsignallers                            

    Track Vehicle/Machine Operators 

    All track competencies, including:

    • Track Certification
    • Verse testing crews                      
    • Weld testing
    • Switch grinding

    ARTC Muswellbrook:

    Supervision

    Track work teams welders 

    Track Certification

    Aurizon Yard - Hexham:

    Completion and reporting for 950 flash butt welds and 475 aluminothermic welds

    Valley Heights Railway Museum:

    Restore the rail track by removing old sleepers and replace with new sleepers and re railing and reballasting.

    McConnell Dowell & Martinus Joint Venture - current

    Completion and reporting for 950 flash butt welds and 475 aluminothermic welds